![](/images/ico/ico_close.png)
![](/images/ico/ico3.png)
Period of time: 2003年1期
Publisher: Emerald Group Publishing Ltd
Founded in: 1982
Total resources: 64
ISSN: 0957-6061
Subject: TP Automation Technology , Computer Technology
Disclaimer: Any content in publications that violate the sovereignty, the constitution or regulations of the PRC is not accepted or approved by CNPIEC.
Integrated Manufacturing Systems,volume 8,issue 1
Menu
![](/images/ico/ico5.png)
Intelligent simulation-based scheduling of workcells: an approach
By Soon Tan Hock,School Robert de Souza in (1997)
Integrated Manufacturing Systems,volume 8,issue 1 , Vol. 8, Iss. 1, 1997-01 , pp.![](/images/ico/ico5.png)
Systems integration - coping with legacy systems
Integrated Manufacturing Systems,volume 8,issue 1 , Vol. 8, Iss. 1, 1997-01 , pp.![](/images/ico/ico5.png)
Organizational growth demands concurrent engineering
By Tang Nelson K.H.,Jones Ossie,Forrester Paul L in (1997)
Integrated Manufacturing Systems,volume 8,issue 1 , Vol. 8, Iss. 1, 1997-01 , pp.![](/images/ico/ico5.png)
Performance evaluation of a manufacturing system with multi-level stock profile
Integrated Manufacturing Systems,volume 8,issue 1 , Vol. 8, Iss. 1, 1997-01 , pp.![](/images/ico/ico5.png)
Enhancing flexibility of vision-based robots using an artificial neural network approach
By Sim Siang Kok,Teo Ming Yeong in (1997)
Integrated Manufacturing Systems,volume 8,issue 1 , Vol. 8, Iss. 1, 1997-01 , pp.![](/images/ico/ico5.png)
Adaptive simulation of a keyboard assembly cell
By Spedding T.A.,Lee W.L.,Souza R de,Lee S.S.G. in (1997)
Integrated Manufacturing Systems,volume 8,issue 1 , Vol. 8, Iss. 1, 1997-01 , pp.![](/images/ico/ico5.png)
Economical optimization of tool replacement intervals
By Jianqiang Mou,Keow Lee Moi in (1997)
Integrated Manufacturing Systems,volume 8,issue 1 , Vol. 8, Iss. 1, 1997-01 , pp.