Period of time: 2013年1-2期
Publisher: Inderscience Publishers
Founded in: 2006
Total resources: 21
ISSN: 1741-9174
Subject: TP Automation Technology , Computer Technology
Disclaimer: Any content in publications that violate the sovereignty, the constitution or regulations of the PRC is not accepted or approved by CNPIEC.
International Journal of Agile Systems and Management,volume 3,issue 1-2
Menu
An optimal countermeasure policy to mitigate random capacity disruptions in a production system
By Savachkin Alex A.,Bakir Niyazi Onur,Uribe-Sanchez Andres in (2008)
International Journal of Agile Systems and Management,volume 3,issue 1-2 , Vol. 3, Iss. 1-2, 2008-07 , pp.A scatter search method to minimise makespan of cell scheduling problem
By Saravanan M.,Haq A. Noorul in (2008)
International Journal of Agile Systems and Management,volume 3,issue 1-2 , Vol. 3, Iss. 1-2, 2008-07 , pp.Design of flexible manufacturing cell considering uncertain product mix requirement
By Dixit Amit Rai,Mishra P.K. in (2008)
International Journal of Agile Systems and Management,volume 3,issue 1-2 , Vol. 3, Iss. 1-2, 2008-07 , pp.By Ho Lip Tse,Lin Grier in (2008)
International Journal of Agile Systems and Management,volume 3,issue 1-2 , Vol. 3, Iss. 1-2, 2008-07 , pp.Measurement of needed reconfiguration level for manufacturing firms
By Garbie Ibrahim H.,Parsaei Hamid R.,Leep Herman R. in (2008)
International Journal of Agile Systems and Management,volume 3,issue 1-2 , Vol. 3, Iss. 1-2, 2008-07 , pp.Establishing rules to design a minicell-based manufacturing system for mass customisation
By Thuramalla Smitha,Badurdeen Fazleena in (2008)
International Journal of Agile Systems and Management,volume 3,issue 1-2 , Vol. 3, Iss. 1-2, 2008-07 , pp.Design and analysis of an automated container handling system in seaports
By Asef-Vaziri Ardavan,Khoshnevis Behrokh,Rahimi Mansour in (2008)
International Journal of Agile Systems and Management,volume 3,issue 1-2 , Vol. 3, Iss. 1-2, 2008-07 , pp.Task assignment and scheduling in a constrained manufacturing system using GA
By Choudhury B.B.,Mishra D.,Biswal B.B. in (2008)
International Journal of Agile Systems and Management,volume 3,issue 1-2 , Vol. 3, Iss. 1-2, 2008-07 , pp.Using data mining in the manufacturing systems for CAD model analysis and classification
By Al-Mubaid Hisham,Nasr Emad S. Abouel,Kamrani Ali K. in (2008)
International Journal of Agile Systems and Management,volume 3,issue 1-2 , Vol. 3, Iss. 1-2, 2008-07 , pp.Optimising the Gaussian-distributed filling process parameters
By Hassan Mohammed H. in (2008)
International Journal of Agile Systems and Management,volume 3,issue 1-2 , Vol. 3, Iss. 1-2, 2008-07 , pp.