![](/images/ico/ico_close.png)
![](/images/ico/ico3.png)
Period of time: 2014年1期
Publisher: Springer Publishing Company
Founded in: 1984
Total resources: 103
ISSN: 0254-5330
Subject: TP Automation Technology , Computer Technology
Disclaimer: Any content in publications that violate the sovereignty, the constitution or regulations of the PRC is not accepted or approved by CNPIEC.
Annals of Operations Research,volume 92,issue 1
Menu
![](/images/ico/ico5.png)
By Glazebrook K.D.,Niño-Mora J. in (1999)
Annals of Operations Research,volume 92,issue 1 , Vol. 92, Iss. 1, 1999-01 , pp.![](/images/ico/ico5.png)
Almost optimal policies for stochastic systemswhich almost satisfy conservation laws
By Glazebrook K.D.,Garbe R. in (1999)
Annals of Operations Research,volume 92,issue 1 , Vol. 92, Iss. 1, 1999-01 , pp.![](/images/ico/ico5.png)
Heuristic algorithms for job-shop scheduling problemswith stochastic precedence constraints
By Neumann K.,Schneider W.G. in (1999)
Annals of Operations Research,volume 92,issue 1 , Vol. 92, Iss. 1, 1999-01 , pp.![](/images/ico/ico5.png)
![](/images/ico/ico5.png)
Scheduling multi-operation jobs on a single machine
By Gerodimos A.E.,Glass C.A.,Potts C.N.,Tautenhahn T. in (1999)
Annals of Operations Research,volume 92,issue 1 , Vol. 92, Iss. 1, 1999-01 , pp.![](/images/ico/ico5.png)
Single-machine scheduling to minimize maximumtardiness with minimum number of tardy jobs
By Gupta J.N.D.,Hariri A.M.A.,Potts C.N. in (1999)
Annals of Operations Research,volume 92,issue 1 , Vol. 92, Iss. 1, 1999-01 , pp.![](/images/ico/ico5.png)
The setup polytope of N-sparse posets
By Schrader R.,Wambach G. in (1999)
Annals of Operations Research,volume 92,issue 1 , Vol. 92, Iss. 1, 1999-01 , pp.![](/images/ico/ico5.png)
Recovering cyclic schedules from delay
Annals of Operations Research,volume 92,issue 1 , Vol. 92, Iss. 1, 1999-01 , pp.![](/images/ico/ico5.png)
A new lower bound for the open-shop problem
By Guéret C.,Prins C. in (1999)
Annals of Operations Research,volume 92,issue 1 , Vol. 92, Iss. 1, 1999-01 , pp.![](/images/ico/ico5.png)
A polynomial algorithm for the three-machineopen shop with a bottleneck machine
By Drobouchevitch I.G.,Strusevich V.A. in (1999)
Annals of Operations Research,volume 92,issue 1 , Vol. 92, Iss. 1, 1999-01 , pp.