![](/images/ico/ico_close.png)
![](/images/ico/ico3.png)
Period of time: 2014年8期
Publisher: Taylor & Francis Ltd
Founded in: 1990
Total resources: 140
ISSN: 1366-5871
Subject: TP Automation Technology , Computer Technology
Disclaimer: Any content in publications that violate the sovereignty, the constitution or regulations of the PRC is not accepted or approved by CNPIEC.
Production Planning and Control,volume 16,issue 8
Menu
![](/images/ico/ico5.png)
By Artiba Abdelhakim,Gharbi Ali in (2005)
Production Planning and Control,volume 16,issue 8 , Vol. 16, Iss. 8, 2005-12 , pp.![](/images/ico/ico5.png)
Productivity drivers in machine and metal product manufacturing
By Karjalainen J.,Miettinen I.,Mikkola T. in (2005)
Production Planning and Control,volume 16,issue 8 , Vol. 16, Iss. 8, 2005-12 , pp.![](/images/ico/ico5.png)
Heuristic-based approach for an industrial three-dimensional layout problem
Production Planning and Control,volume 16,issue 8 , Vol. 16, Iss. 8, 2005-12 , pp.![](/images/ico/ico5.png)
Retrieving designs from a sketch using an automated GT coding and classification system
By Barton J.,Love D. in (2005)
Production Planning and Control,volume 16,issue 8 , Vol. 16, Iss. 8, 2005-12 , pp.![](/images/ico/ico5.png)
Applying two-stage SOM-based clustering approaches to industrial data analysis
By Canetta L.,Cheikhrouhou N.,Glardon R. in (2005)
Production Planning and Control,volume 16,issue 8 , Vol. 16, Iss. 8, 2005-12 , pp.![](/images/ico/ico5.png)
Enterprise resource planning systems in the aluminium conversion industry
By David F.,Pierreval H.,Caux C. in (2005)
Production Planning and Control,volume 16,issue 8 , Vol. 16, Iss. 8, 2005-12 , pp.![](/images/ico/ico5.png)
An application of cyclical master production scheduling in a multi-stage, multi-product environment
By Van Den Broecke F.,Van Landeghem H.,Aghezzaf El-Houssaine in (2005)
Production Planning and Control,volume 16,issue 8 , Vol. 16, Iss. 8, 2005-12 , pp.