Arcing time on the disconnected phase of a 500 KV overhead line during a single-phase automatic reclosing cycle

Author: Raskovalov Yu.   Lir E.  

Publisher: Springer Publishing Company

ISSN: 1570-145X

Source: Power Technology and Engineering, Vol.44, Iss.1, 2010-05, pp. : 83-86

Disclaimer: Any content in publications that violate the sovereignty, the constitution or regulations of the PRC is not accepted or approved by CNPIEC.

Previous Menu Next

Abstract

Related content