Increasing the reliability of the shutdown of 500 - 750-kV overhead lines equipped with shunt reactors in an unsuccessful three-phase automatic repeated closure cycle

Author: Kuz'micheva K.   Merzlyakov A.   Fokin G.  

Publisher: Springer Publishing Company

ISSN: 1570-145X

Source: Power Technology and Engineering, Vol.47, Iss.1, 2013-05, pp. : 71-75

Disclaimer: Any content in publications that violate the sovereignty, the constitution or regulations of the PRC is not accepted or approved by CNPIEC.

Previous Menu Next

Abstract