A heuristic for scheduling in a flowshop with the bicriteria of makespan and maximum tardiness minimization

Author: Chakravarthy K.   Rajendran C.  

Publisher: Taylor & Francis Ltd

ISSN: 1366-5871

Source: Production Planning and Control, Vol.10, Iss.7, 1999-10, pp. : 707-714

Disclaimer: Any content in publications that violate the sovereignty, the constitution or regulations of the PRC is not accepted or approved by CNPIEC.

Previous Menu Next

Abstract