Heuristic for scheduling in a two-machine bicriteria dynamic flowshop with setup and processing times separated

Author: Su L-H.   Chou F-D.  

Publisher: Taylor & Francis Ltd

ISSN: 1366-5871

Source: Production Planning and Control, Vol.11, Iss.8, 2000-12, pp. : 806-819

Disclaimer: Any content in publications that violate the sovereignty, the constitution or regulations of the PRC is not accepted or approved by CNPIEC.

Previous Menu Next

Abstract