Author: Wuttipornpun T.
Publisher: Taylor & Francis Ltd
ISSN: 1366-5871
Source: Production Planning and Control, Vol.18, Iss.8, 2007-12, pp. : 703-715
Disclaimer: Any content in publications that violate the sovereignty, the constitution or regulations of the PRC is not accepted or approved by CNPIEC.
Abstract
Related content
Optimal pacing in an assembly-based multi-stage production system
Annals of Operations Research, Vol. 87, Iss. 1, 1999-01 ,pp. :
Material handling devices dimensioning in multi-stage assembly line
By Braglia M.
Production Planning and Control, Vol. 12, Iss. 1, 2001-01 ,pp. :
A rule-based heuristic finite capacity scheduling system for semiconductor backend assembly
By Xiao-Feng Yin Tay-Jin Chua Feng-Yu Wang Ming-Wei Liu Tian-Xiang Cai Wen-Jing Yan Chin-Soon Chong Ju-Ping Zhu Mei-Yoke Lam
International Journal of Computer Integrated Manufacturing, Vol. 17, Iss. 8, 2004-12 ,pp. :